Where Is Time Being Lost on the Production Floor?

Across 3 plants, 5 models, and 5 key suppliers — this analysis traces production delays from the plant level down to the model-supplier intersection during the Afternoon shift Body Assembly stage.

Where Is Time Being Lost on the Production Floor?